Three Alstom Model Pg 6551b 50Hz, 38Mw Gas Turbine Generators

Three (3) Alstom Model Pg 6551b, Single-Shaft, Industrial Type Gas Turbine 50Hz Unit, Fully Packaged And Completed


( Item # = PG0176 )  Three Alstom Model Pg 6551b 50Hz, 38Mw Gas Turbine Generators

Three Alstom Model Pg 6551b 50Hz, 38Mw Gas Turbine Generators  - 
Quote request form for power generation Equipment - Three (3) Alstom Model Pg 6551b, Single-Shaft, Industrial Type Gas Turbine 50Hz Unit, Fully Packaged And Completed With The Following Major Items Of Equipment For Each Gt:
Three Alstom Frame 6, 50Hz, 38Mw Gas Turbine Generators

?One (1) auxiliary compartment with
-Diesel engine with silencer starting device and torque converter,
-On-base dual fuel system (natural gas and distillate N02)
-Atomizing air system,
-On-base lubrication system (double filters,/ double coolers) with
sufficient capacity to satisfy the requirements of the gas turbine,
generator and load gear box,
-Hydraulic oil system,
-Standard auxiliary gear,
-Shaft-driven cooling water pump,
-On-base heating and ventilation,
-Fire detection system
?One (1) gas turbine compartment with:
-Variable inlet guide vanes,
-Compressor and expansion gas turbine,
-Ignition and combustion systems,
-Inlet and exhaust plenum,
-Ventilation system,
-Fire detection and protection system,
-Seismic vibration probes,
-Water injection system for NOx reduction

1.2 Three (3) gas turbine air inlet filters houses, including weather hood,
prefilter, coalescer, and hight efficiency filter
1.3 Three (3) sets of walkways and access ladders for each unit.
1.4 Three (3) oil mist eliminators.
1.5 Three (3) sets of gas turbine inlet air ducting and 8’ silencing
equipment with supporting structures. Three (3) acoustical enclosures (85
db(A) at 1 meter).
1.6 Three (3) acoustical enclosures (85 db(A) at 1 meter).
1.7 Three (3) sets of lateral exhaust systems with 10’ Silencing equipment
with stacks (20 m AGL)
1.8 Three (3) sump tanks of 1.8m3 capacity each.
1.9 Three (3) water injection skids for NOx.
1.10 One (1) gas turbine compressor washing skid of our standardized design
with one 10 m3 tank common for the 3 gas turbines
1.11 Three (3) fire protection Systems for gas turbine including C02 bottles
on a rack 2

2. Three (3) GEC ALSTHOM synchronous air cooled generators, 3 phases, 11 kV,
50 Hz, with the following major items of equipment:
-Vertical offset, double helical load gear,
-Filtered air cooling system,
-Brush less exciter,
-Medium voltage platform including:
-Neutral grounding equipment,
-Potential and current transformer,
-Excitation transformer,
-Capacitors.

2.1 Three (3) gas turbine control compartments, completed with the following
panels and associated equipment:
-Speedtronic Mark V turbine control panel,
-Generator control and protection panel (including main transformer
protections),

-400 V AC and 125 V DC motor control centers and distribution panels,
  -Generator excitation and AVR panel,
  -125 V DC battery charger and 125 V DC CD/Ni battery.

2.2 Three (3) metal clad compartments including the following major items of
equipment:

-generator circuit breaker, 52 G,
-auxiliary power transformer for GT auxiliaries,
-one (1) circuit breaker (station auxiliary feeders),
-Lightning Arrestors

3. Fuel gas systems consisting of the following major items of equipment
  -Three (3) GT final separator with manual drain (1 x 100% for each GT).
-Three (3) GT gas flow measurement units diaphragm type ( 1 x 100% for each
GT).

3.1 N02 Distillate fuel oil systems consisting of the following major items
of equipment:
-Three (3) distillate fuel oil filtering skids (One each for GT)
-One distillate fuel oil forwarding skid common for 3 Gas Turbines
comprising of 3 pumps out of which one is a standby of 15 m3/h capacity.
 

Casinos

Craps Casino - Play Craps watch Animated Craps learn Craps Strategy

Poker Casino - Video Poker online, a poker game that can be played for free or real money

blackjack Casino - Blackjack Free game download or play for real money

Roulette Casino - different ways to place roulette bets in European Roulette

Keno Casino - Free Keno keno rule and keno strategy for playing internet keno

Slots Casino - slot machine casino has regular slot machine & free slot game download
 
 
Free Casino Games software Download

Diesel Generators
Steam Turbine Generators
Gas Turbine Generators
Power Generation Equipment Listing Form

Workers Compensation Insurance information board - Cork Board for Workers Compensation Insurance no affiliation with the Workplace Safety And Insurance Board of Ontario (WSIB)

Cork board for Workers Compensation Board - This site is a link to the Workers Compensation cork board not part of or approved by the Ontario WSIB Workplace Safety Insurance Board of Ontario WSIB

Province of Ontario Business Advisory Watch - This is a Ontario business advisory for clients and associate businesses with finical interest in the Province of Ontario or that are planing on investing in future business within Ontario

Worker Compensation, no part of Workplace Safety And Insurance Board WSIB  - This is a cork board for WSIB worker compensation, no part of or paid for WSIB Workplace Safety And Insurance Board Ontario Canada

Workers Compensation WSIB Cork Board - Workers Compensation information cork board isn't financed by WSIB Workplace Safety And Insurance Board of Ontario