Three Alsthom Steam Turbine Generators 17Mw 50Hz

17Mw 50Hz Steam Turbine Generators


( Item # = PG0165 )  Three Alsthom Steam Turbine Generators 17Mw 50Hz

Three Alsthom Steam Turbine Generators 17Mw 50Hz Quote request form for power generation Equipment- Make Alsthom  Model T167-215 Inlet Pressure 40 bar Inlet Temperature 465ºC Condenser Pressure 0.072 bar Temp 40ºC M.C.R 78 TPH Max 857 PIH  0.35bar requirement 0.35 bar = 108ºC (gauge pressure) Number 1 Heater 2bar (a) = 121ºC 3.38 Tonnes Number 2 Heater 7bar (a) = 165ºC 3.08 Tonnes Condensor 59 TPH  Y02 Heater 100 ºC Speed 3,000 rpm Output 17 MW @ 5.5Kv Cycle 50 Hz 
 

Make Alsthom 
Model T167-215 
Inlet Pressure 40bar 
Inlet Temperature 465ºC 
Condenser Pressure 0.072bar Tem 40ºC
M.C.R 78 TPH Max 857 PIH
 0.35bar requirement
 0.35 bar = 108ºC (gauge pressure)
Number 1 Heater 2bar (a) = 121ºC 3.38 Tonnes
Number 2 Heater 7bar (a) = 165ºC 3.08 Tonnes
Condenser 59 TPH 
Y02 Heater 100ºC 
Speed 3,000 rpm 
Output 17 MW @ 5.5Kv 
Cycle 50 Hz 
 

Unit Detail
 Unit 1 Unit 2 Unit 3
Commission Date Jan 1966 Sept 1969 Dec 1969
ID Number 3299 3353 3354
Run Hours 71,000 47,000 46,000
Stops – 72 hrs or more 32 28 36
Number of starts after 72 hrs 115 168 173
 

Plant Sizes and Weights
 Weight (tonnes) Size (mm)
Alternators 
? Stator 32.5 6500 x 2700 x 2500
? Rotor 10.0 550 diam x 6100
Turbine 
? Top Casing 12.5 5000 x 3600 x 2000
? Bottom Casing 20.0 5600 x 3600 x 2000
? Rotor 5.0 2000 diam x 6000
? Condenser 31.0 6400 x 3400 x 5100
? Tanks 6.5 3000 x 3900 x 7000
 
 
 
 

Site I.
The three turbine impellers, housings, alternators and rotors are stored in containers and on container flats in a secured warehouse.  They are stored under plastic tents in both a thermostatically and humidity controlled atmosphere.

Site II.
The three condensers, tanks, pumps, de-aerators and other ancillary equipment (outlined below) are stored in a secured depot with the majority of the equipment being containerized.

Container TPHU 645664 7
? 6 Extraction pumps
? 6 Extraction pump motors
? 6 Extraction pump suction chambers
? 3 spare extraction pump spindles
? 3 sight glasses and pipework (probably oil tank)
? 3 + 3 Valve chest cover panels
? 4 spare rear alternator bearings
? 1 front alternator bearings – spare
? 1 Extraction pump impeller - spare

Container MLCU 229977 0
? Numbers 2, 3 and 4 turbine governor – oil pump housing (front hydraulic unit pedestal)
? 3 turbine cylinder covers
? Numbers 2, 3 and 4 alternator bearing housing
? Numbers 2, 3 and 4 governor control linkages

Container MLCU 212380 0
? Numbers 2, 3 and 4 Excitation units (complete)
? 3 turbine cylinder covers
? Drum of new spare condenser tube erosion shields
? 2 drums assorted spares
? 3 AC oil pumps
? 1 DC oil pump
? 1 spare oil pump

Container GSTU 416747 6
? Numbers 2, 3 and 4 main steam inlet control valves
? 2 control valve handwheels
? 2 condenser CW valves
? 2 half drums of spares

Container XTRU 201486 5
? 3 turbine base plates
? 6 turbine side plates
? 3 alternator base plates
? turbine cylinder covers 

Container GSTU 460832 9
? turbine base and front plates
? various steam  and water valves
? hydraulic pipework
? 3 hydraulic turbine control units with covers
? 3 steam spray control valves
? 2 constant head chambers
? 10 condenser expansion joints OD 780mm, ID 590mm

Container XTRU 211329 8
? 12 condenser plates (bases for springs)
? 3 oil cooler change over valves
? 3 drains cooler (??) units
? 60 condenser spring
? 6 oil coolers
? 1 water/water cooler
? 2 oil tank sight glasses

Container GSTU 414760 7
? condenser tubes
? 1 electric feed pump on bed – with motor
? 3 water/air cooler units and inlet and outlet caps

Container ITLU 653024 5
? 1 feed pump on bed – no motor
? 1 turbo feed pump unit on bed
? 1 electric feed pump with motor on bed
? 1 electric motor for feed pump
? 1 water/air cooler unit
? condenser tubes
 

Test Results – Final rotor results

Rotor Date Temperature ºC IR at 0.5 kV (megohms) PI
  Air Winding Actual Corrected to 40ºC 
    1 min 10 min 1 min 10 min 
 1/11/01 
T4  25 37 3500 15000 3150 13500 4.28
T2  25 37 16000 40000 14400 36000 2.50
T3  25 37 6000 17000 5400 15300 2.80
 

Test Results – Final stator results

Stator Date Temperature ºC IR at 2.5 kV (megohms) PI
  Air Winding Actual Corrected to 40ºC 
    1 min 10 min 1 min 10 min 
No10 9/11/01  23 24 
L1    3250 9000 2435.5 6750 2.77
L2    3000 7500 2250 5625 2.50
L3    3300 9000 2475 6750 2.73

No 12 9/11/01 23  31 
L1    3750 9000 2250 5400 2.40
L2    3750 9500 2250 5700 2.53
L3    3900 9000 2340 5400 2.31

No 11 16/11/01 24 47 
L1    1100 4000 1650 6000 3.63
L2    1050 3750 1575 5625 3.57
L3    1250 4000 1875 6000 3.20
 

- New Zealand
- Year of Manufacture: 1966-1969

Casinos

Craps Casino - Play Craps watch Animated Craps learn Craps Strategy

Poker Casino - Video Poker online, a poker game that can be played for free or real money

blackjack Casino - Blackjack Free game download or play for real money

Roulette Casino - different ways to place roulette bets in European Roulette

Keno Casino - Free Keno keno rule and keno strategy for playing internet keno

Slots Casino - slot machine casino has regular slot machine & free slot game download
 
 
Free Casino Games software Download

Diesel Generators
Steam Turbine Generators
Gas Turbine Generators
Power Generation Equipment Listing Form

Workers Compensation Insurance information board - Cork Board for Workers Compensation Insurance no affiliation with the Workplace Safety And Insurance Board of Ontario (WSIB)

Cork board for Workers Compensation Board - This site is a link to the Workers Compensation cork board not part of or approved by the Ontario WSIB Workplace Safety Insurance Board of Ontario WSIB

Province of Ontario Business Advisory Watch - This is a Ontario business advisory for clients and associate businesses with finical interest in the Province of Ontario or that are planing on investing in future business within Ontario

Worker Compensation, no part of Workplace Safety And Insurance Board WSIB  - This is a cork board for WSIB worker compensation, no part of or paid for WSIB Workplace Safety And Insurance Board Ontario Canada

Workers Compensation WSIB Cork Board - Workers Compensation information cork board isn't financed by WSIB Workplace Safety And Insurance Board of Ontario